top of page
Roof extension
The frontside of the roof extension's generalised form is described within an edict from the council written by an architectural historian.
However the main volume has prefabricated sectional form which allows for precise construction and finishing, with simple material use and good insulation.
The extension takes a day to place on the roof and is quick to finish, saving time and therefore expense.
Top Up
bottom of page